Winnipeg's Louise Bridge to close Friday for repairs

3 week_ago 12

Manitoba·New

The Louise Bridge volition beryllium closed to drivers for much than six hours connected Friday arsenic workers repair bearings connected the century-old bridge.

Bridge volition stay unfastened for morning, evening unreserved hour, but adjacent from 9 a.m. to 3:30 p.m.

CBC News

· Posted: Mar 26, 2025 12:51 PM EDT | Last Updated: 9 minutes ago

A steel-truss span  is shown.

The Louise Bridge volition beryllium closed to Winnipeg drivers from 9 a.m. to 3:30 p.m. connected Friday. (CBC)

The Louise Bridge volition beryllium closed to drivers for much than six hours connected Friday arsenic workers repair bearings connected the century-old bridge.

The bridge, which crosses the Red River betwixt Point Douglas and Elmwood, is scheduled to adjacent from 9 a.m. to 3:30 p.m. connected Friday. 

It volition inactive beryllium unfastened for the greeting and evening unreserved periods, the metropolis said successful a quality release. The bridge's westbound sidewalk volition stay unfastened for pedestrians passim the day. 

Drivers tin transverse the stream utilizing the Provencher Bridge oregon Disraeli Bridges during the closure. 

More from CBC Manitoba:

read-entire-article