Nova Scotia·New
The closure is scheduled from Friday, May 2, astatine 7 p.m. to Monday, May 5, astatine 5:30 a.m. The span volition inactive beryllium unfastened to pedestrians and cyclists, who volition stock the designated walkway.
Bridge inactive unfastened to pedestrians and cyclists, who volition stock the designated walkway
Anjuli Patil · CBC News
· Posted: May 02, 2025 5:00 AM EDT | Last Updated: 1 infinitesimal ago
The Angus L. Macdonald Bridge volition beryllium closed again this play for work that's part of the two-year, $70-million project to widen the bridge's life.
The closure begins Friday astatine 7 p.m. and ends Monday astatine 5:30 a.m.
The span volition remain open to pedestrians and cyclists, who volition stock the designated walkway.
"Users are urged to workout caution and obey each directions from postulation control. Cyclists indispensable locomotion their bicycles successful the country of the pedestrian tunnel, adjacent the Dartmouth tower," Halifax Harbour Bridges said successful a quality release.
Halifax Harbour Bridges said postulation delays are expected, truthful drivers should program ahead, usage alternate routes and let other clip to scope destinations.
This is the 2nd of perchance 4 Macdonald Bridge closures this twelvemonth successful narration to what the span committee has dubbed Project LifeSpan.